Our Projects
Showcasing Our Signature Projects: A Selection of Key Achievements
Morehead Dam and Pond
The project increased the dam's capacity and improved accessibility by redesigning the entry points. This enhancement not only facilitated easier access for maintenance and emergency services but also ensured a more efficient flow of water, contributing to better management of reservoir levels during peak usage.
Connected Bike Lanes
The City of El Paso sought to connect fragmented bike routes across the city, completing its comprehensive Bikeway Plan. The third phase of the project included a redesign of the entry for a roundabout at Pebble Hills, improving accessibility and traffic flow for cyclists and drivers alike.
Transmountain Commercial Park Unit 2
This project prompted GRV to prepare improvement drawings for a 12-acre development. The improvements consisted of a new 8" waterline (wet tap to an existing 48" steel waterline), an 8" sewer line, new retention ponding area, storm sewer systems, new 24' access roadway, three new concrete driveways connecting to state roads, new fourth leg of the existing traffic signal, grading, sidewalk and curb and gutter.
Work Categories
Civil/Traffic Engineering & Land Surveying
Hydrology & Hydraulic Studies
Land Development
Traffic Impact Studies & Data Collection
Civil/Traffic Engineering & Land Surveying
Civil/Traffic Engineering & Land Surveying
Stormwater & Flood Management
Roadway & Traffic Design
Utility Systems Design
Land Surveying
Boundary Surveying
ALTA Surveys

© 2024 by GRV
Created on Wix Studio.













